existing infrastructure.

  • Four different ski jumps of varying heights, including a bubble system to soften the water and a slip'n'slide
  • One elevated trampoline right next to the water, two additional Eurotramps® on solid ground
  • Covered dry area for warming up and strength training

Future infrastructure.

  • Construction of a high diving tower including a bubble system
  • Expansion and deepening of the water basin to 5m
  • Replacing the warm-up area tent with a gymnastics hall equipped with the necessary dryland training apparatus for aerials and high diving
Construction plan of the new High Diving Facility in Mettmenstetten

The Tower.

Building plan of the high diving tower

The current building plan includes the following elements:

  • Plattforms at 5, 10, 12, 15 and 20 metres
  • An elevator that can raise the 20 metre platform (women's competition height) to 27 metres (men's competition height)
  • A bubble system on platforms 15 metres and below to soften landings

Further building plans.

Two construction plans of the high diving facility from a side perspective